Text size:

  • Small
  • Normal
  • Large
The wind turbine at Al Shohub Private School in Khalifa City A. Delores Johnson / The National
The wind turbine at Al Shohub Private School in Khalifa City A. Delores Johnson / The National

Wind turbine at capital school teaches students about clean energy

A wind turbine will help an Abu Dhabi school meet its energy needs.

A school in Abu Dhabi has installed a wind turbine that will help it to meet its energy requirements.

Al Shohub School hopes the 10-kilowatt turbine will produce 10,300 kilowatts of power a year for its new campus in Khalifa City A, which is set to open this autumn.

That figure may be a small proportion of the school's total energy needs, but the turbine will help the school to reduce its carbon-dioxide emissions by a significant 2,400 kilograms a year. It will also give the pupils a valuable lesson.

"It will give an indication to all students that you can use wind power to produce electricity," said Alaa Al Bayaty, head of engineering for the office of Dr Sheikh Sultan bin Khalifa Al Nahyan, the school's owner.

The turbine, a white structure nearly 30 metres tall, is not yet generating power but is expected to start in between two and three weeks.

Electricity produced will power three of the school's science laboratories.

Sockets in the labs will be a different colour to those in the rest of the school to remind students that clean power is being used.

Its power will also be used to cool a 20-square-metre service room, where the system's batteries and control panels will be placed.

Sheikh Sultan decided to install the turbine, the first in a UAE school, in May. Five consultancies submitted designs, with Makan Consulting Engineers winning the tender.

The school covers a built-up area of 13,000 square metres and includes a science and art laboratories, an indoor swimming pool and two libraries.

The school meets the one-pearl criteria under the Estidama green building system by the Urban Planning Council.

Initially, 700 students will move into the new school from an old campus in Abu Dhabi. The building has a capacity to handle as many as 1,200 pupils from kindergarten to Grade 12.

Construction started in September last year, with Nurol appointed the main contractor. The company that designed, supplied and installed the wind turbine is Dubai's Vista Eco Solutions.

While the UAE may have greater potential for solar energy, harnessing wind power takes up less space and can be more eye-catching, said Ashraf Taha, a director at Eco Solutions.

"Something as high as this will be seen by everyone passing by," said Mr Taha. "I think you can even spot it from the highway, driving between Dubai and Abu Dhabi."

Wind speeds at the site range between three and eight metres a second, so the turbine is expected to be working at least 70 per cent of the time, he said.

"It will provide good information for other wind-power projects in the country," Mr Taha said.

About 700 workers are putting the finishing touches to the school. Construction is expected to be completed next month.

vtodorova@thenational.ae

Back to the top

More articles


Editor's Picks

 Marina Square apartments Reem Island: Q1 2% rise. Studio - Dh65-68,000. 1BR - Dh75-95,000. 2BR - Dh110-145,000. 3BR - Dh170-190,000. Q1 2013-Q1 2014 no change. Sammy Dallal / The National

In pictures: Where Abu Dhabi rents have risen and fallen, Q1 2014

Find out how rental prices in the prime locations in Abu Dhabi have altered during the first three months of the year and the current rates you will pay according to data provided by Asteco.

 A model of the plans for Saadiyat Island’s Cultural District, which was on display at the Global Cityscape exhibition at Dubai International Convention and Exhibition Centre last year. Ali Haider / EPA

Building the future on Abu Dhabi’s Saadiyat Island

Nick Leech meets Jassim Al Hammadi, the engineer charged with providing the services that will make the Saadiyat Cultural District tick.

 Business class seats inside the Emirates Airbus A380. Chip East / Reuters

In it for the long haul: flying 16 hours with Emirates to LA

Our executive travel reviewer tries out the business class offering on Emirates' longest A380 route - and finds time passing quickly.

 Ashish Nehra of Chennai Super Kings bowls to Kings XI Punjab at Zayed Cricket Stadium in Abu Dhabi. Ravindranath K / The National

Hard-hitting Chennai not deterred by opening loss in IPL

But some questions remain about the team's attack ahead of Monday's match against Delhi Daredevils in Abu Dhabi, writes Osman Samiuddin.

 From left: Alex Ritman, his favorite waiter and friend Andy Tillett at Baithal Ravi in 2009. Courtesy Alex Ritman

Lamenting Bur Dubai’s Baithal Ravi Restaurant

When I heard that a fire had ripped through the restaurant known as Ravis in the Bur Dubai district of Dubai, my outburst was met with echoed monosyllabic despair among numerous friends on social media.

 Screen shot from Vin Deisel's facebook page of he and Michelle Rodriguez in Abu Dhabi for the filming of Fast & Furious 7. April 2014

Fast & Furious in Abu Dhabi, a social media frenzy

Fast & Furious 7 wraps up an eventful and much-anticipated week of filming in the capital. Let's take a look at what went on via the key players' social media, while they were enjoying the delights of the desert.

Events

To add your event to The National listings, click here

Get the most from The National